2026年10月30日 丨 网站首页 丨 返回旧版

倒计时12天–“2025第四届东盟轨道交通国际峰会”最新情况公布|Only 12 Days Away–The 4th ASEAN Rail Summit 2025

东盟轨道交通的发展使得东盟得以构建起更为紧密的经济联系,这些项目为地区现代化进程注入了新动力。基于此背景,“2025第四届东盟轨道交通国际峰会”将在2025年1月9日至10日在马来西亚·吉隆坡召开,届时诚邀您共同讨论和见证东盟轨交的行业建设和发展。

The development of ASEAN rail transit has allowed ASEAN to build closer economic ties, and these projects have injected new impetus into the modernization process of the region. Based on this background, “The 4th ASEAN Rail Summit 2025” will be held in Kuala Lumpur, Malaysia from January 9 to 10, 2025, and welcome to attend to discuss and witness the construction and development of the ASEAN rail transit industry.

一、【Organizational Structure/大会组委会】

二、【General Conference Overview/大会议程】

1月9日

议题1:

全球化进程下东盟轨交市场发展

Morning Development of ASEAN Rail Market under Globalization

议题2:

数字技术驱动轨交项目建设

Afternoon Digital Technology Driving the Construction of Rail Transit Projects

1月10日

议题3:

跨境项目规划,标准化筑基,投融资拓机

Morning Cross-border Project Planning, Standardization as the Foundation, Investment & Financing Opportunities Expansion

议题4:

数字化赋能智慧运营与高效维保

Afternoon Digitization Empowers Intelligent Operations and Efficient Maintenance

三、【Part of Confirmed Speakers/确认发言嘉宾阵容】

四、【Hot Topics / 热点议题】

(1)互联互通——全球轨道交通市场状况及发展前景

Interconnection and Interoperability: Global Rail Transit Market Status and Development Prospects
(2)马来西亚轨交网络深度剖析:项目布局与未来增长

In-Depth Analysis of Malaysia’s Rail Transit Network: Project Layout and Future Growth
(3)经营地铁,服务城市——深圳地铁可持续发展 创新实践与探索

Operating Metro Services for the City: Innovative Practices and Explorations in the Sustainable Development of Shenzhen Metro
(4)革新铁路培训领域:学习技术的力量与转型

Transforming Rail Training with Learning Technologies
(5)东盟铁路网络互操作性和协调性分析

Introduction to ASEAN Railway Network Interoperability and Harmonization
(6)印尼铁路及城市轨道交通市场展望

Outlook on Indonesia’s Railway and Urban Rail Transit Market
(7)深化东盟标准化合作:全球视野下的互联互通策略

Deepening ASEAN Standardization Cooperation: Interconnection and Interoperability Strategies from a Global Perspective
(8)越南轨交标准化建设探索与实践

Exploration and Practice of Vietnam`s Rail Transit Standardization Construction
(9)借助技术进步深化并加强商业伙伴合作关系

Harnessing Technological Advancements to Strengthen Business Partnerships
(10)南宁地铁空调节能系统的创新应用与标准化产业化之路

Application, Standardization and Indushtrializatiation of  Fine Design+Direct Expansion+Control by Subway air conditioning energy-saving system in Nanning Metro
(11)四川永贵:铁路连接技术的五十载历程

YGC—50 Years for Railway Connection Technology
(12)韩国铁路的未来展望:技术创新与可持续发展

Korean development Experiences & Case studies for Digitalization
(13)台湾智能铁路的发展

Smart Rail Development in Taiwan
(14)MARIC:赋能马来西亚铁路发展、激发创新、增强竞争力

The role of MARIC towards local empowerment, innovation and competitiveness
(15)优化工程与维护管理哲学,迈向卓越运营未来

Enhancing Maintenance Philosophy Towards Engineering & Operational Excellence
(16)雅万高铁的商业化之路

Commercialization of Whoosh
(17)实现菲律宾国家铁路的现代化可持续发展的重要性

Modernizing the Philippine National Railways for Sustainable Growth
(18)信号接口:实现东南亚地区无缝铁路运营的关键

Signalling Interfaces: The Key to Achieving Seamless Railway Operations in the Southeast Asian Region
(19)东盟轨交新蓝图:规划协同、标准统一与投融资创新

ASEAN Rail Transit’s New Blueprint: Planning Coordination, Standardization, and Investment & Financing Innovation
(20)未来出行新纪元:刷脸购票新体验

Pay with your face:Train Ticketing for the future
(21)德铁DB基于数据库的维护体系优化案例分享

Optimization of maintenance regime by DB
(22)通过智能化运营策略提升铁路系统的运载能力与可靠性

Enhancing capacity and reliability of the rail system through smarter operations
(23)智能多选决策工具:铁路战略规划的弹性引擎与快速融资之道

Smart and Multi-optional Decision-making Tools as a Must for More Resilient Rail Strategic Planning and as a way to Fast-track Financing
(24)高铁对地区发展的深远影响

Impact of High-Speed Rail on territories
(25)铁路数字化转型——东盟的下一步发展

Digital Transformation in Railways The Next Development in ASEAN

……持续更新中/Updating

五、【ASEAN RAIL AWARDS 2025 / 亚轨奖】

申报须知:

  1. 该奖项通过企业自主申报,扫描奖项海报二维码,填写奖项申报申请表。
  2. 参评机构可参与奖项类别中所有奖项的评选,并根据参评条件提供参评资料。
  3. 评审委员会将秉着独立、公正、保密的原则对所有申请材料进行筛选与评估。注:目前,马来西亚交通部发言人的具体信息及指导单位的授权事项正处于内部确认阶段,预计将在圣诞节前公布最新的进展情况,请持续关注本次会议的最新情况。

六、【Speak/Register/Media cooperation/Sponsorship cooperation 发言/参会/媒体合作/赞助合作】

  1. 峰会官网:

https://www.shine-consultant.com/prod_view.aspx?TypeId=27&Id=425&FId=t3:27:3

Official Website of the Summit:

http://en.shine-consultant.com/prod_view.aspx?TypeId=11&Id=370&FId=t3:11:3

  1. 联系 Ona Wen 温女士

T:(+86 21)6095 7202

M:(+86)175 1049 7500(VX同号)

E-mail: ona.wen@shine-consultant.com

编辑:卓卓

行业数据 更多